Tuesday, March 15, 2011: 10:20 AM
Room 320 B (George R. Brown Convention Center)
At December 2007 a leak was observed at second reactor R-4802 collector (2-1/4 Cr - 1 Mo), conveying the effluents to the 3rd furnace F-4803 of Semi-regenerating Platforming unit (Unit 048) of Petit Couronne Refinery – France.
| Design | Operation |
Temperature (°C) | 543 | 500 |
Pressure (Bars) | 37,8 | 28,6 |
Fluid : | Hydrocarbons (Naphtha + Hydrogen) | |
Collector Material | Low alloy steel type P22 |
Actions to avoid small grain size zone were implemented, as to use materials with control of the impurities, use of materials with addition of boron (90 to 130 ppm); welding procedure considering pre-heating at 200°C and interpass temperature up to 250°C and PWHT at 760°C during 1h /inch thickness.
Also Inspections actions were taking to assure the quality of repairs and recommendations were implemented in order to modify the design and avoid the blocking of furnace’s tubular elements. Additionally on-site metallurgical examination was included as part of inspection plan.