11150 Failure Analysis: Cracking at Reactor Exit Collector of Platforming Unit

Tuesday, March 15, 2011: 10:20 AM
Room 320 B (George R. Brown Convention Center)
Militza I. Lobaton*
Petroplus Raffinage Petit Couronne

 At December 2007 a leak was observed at second reactor R-4802 collector (2-1/4 Cr - 1 Mo), conveying the effluents to the 3rd furnace F-4803 of Semi-regenerating Platforming unit (Unit 048) of Petit Couronne Refinery – France.
Operational Conditions:

 

Design
Operation
Temperature (°C)
543
500
Pressure
(Bars)
37,8
28,6
Fluid :
Hydrocarbons (Naphtha + Hydrogen)
Collector Material
Low alloy steel type P22
Metallurgical examination shows that cracking was initiated by a localized mechanism known as Creep Type IV at HAZ fine grain zone.  Additional constraints produced by rest of refractory blocking also helped with the development of failure. At operational conditions creep type failures was not expected; but fine grain zone configuration aids to develop the cracking.
 Actions to avoid small grain size zone were implemented, as to use materials with control of the impurities, use of materials with addition of boron (90 to 130 ppm); welding procedure considering pre-heating at 200°C and interpass temperature up to 250°C and PWHT at 760°C during 1h /inch thickness.